Case Studies

Innovation that goes beyond

Our customer was developing a new aircraft, which required a duct with a flexible connection. The incumbent design used a non-metal flexible seal which suffered significant performance degradations under high operating temperatures and required frequent replacement.

Read Case Study

Innovative approach replaces piston with bellows

The U.S. Air Force KC-135 Aerial Refueling Tanker was experiencing severe aircraft downtime due to a highly unreliable piston accumulator used on the fuel boom.

Read Case Study